← All Industries

Agro Processing

Heating systems for oil extraction, soya, and agro industries

Industry Challenges

  • Biomass and multi-fuel requirements
  • Remote plant locations
  • Seasonal capacity needs

Heating Requirements

  • Solid fuel and biomass boilers
  • Process steam for extraction
  • Fuel handling systems

Recommended Solutions

Biomass Fired BoilersMulti Fuel BoilersFuel Handling (BOP)AMC Services

Benefits

  • Proven agro industry experience
  • Fuel-flexible designs
  • Strong after-sales support

Work it out for your plant

We publish steam consumption benchmarks for Oilseed preparation and solvent extraction and Seed preparation only (cleaning, cracking, flaking, conditioning), sourced and dated. The boiler capacity calculator will size a boiler straight from your output figure.

Or read the background in the Knowledge Hub, which covers boiler operations, steam distribution, condensate management and the regulatory position.

Already running a plant? Our lifecycle services cover installation and commissioning, boiler AMC, retrofits, plant audits, spare parts and operator training — on equipment from any manufacturer.

Frequently Asked Questions(3)

How much steam does an edible oil plant use?
Oilseed preparation and solvent extraction together run at roughly 220 to 350 kg of steam per tonne of seed crushed, with about 280 kg typical. Seed preparation alone — cleaning, cracking, flaking and conditioning — accounts for around 90 kg of that. Refining is a separate load on top.
What fuel suits an agro processing plant?
Usually the residue the plant already produces or can buy locally: husk, deoiled cake, briquettes or mixed agro-waste. That is the whole economic argument for the sector. The boiler is then designed around that fuel's moisture, calorific value and ash behaviour rather than being chosen first and fed second.
Is a biomass boiler worth it if fuel supply is seasonal?
Only if the supply is genuinely dependable across the year, or the boiler can burn a second fuel. Multi-fuel grate designs handle that, but a boiler designed around one residue and then run on another will underperform on capacity and foul faster. Tell us both fuels at enquiry, not after commissioning.

Get in Touch

Request a Quote

Tell us about your heating requirement and we'll respond within one business day.

GYANTOSH FABRICATORS PRIVATE LIMITED
GST: 23AACCG5116C2ZA
4, Nyay Nagar, Indore, Madhya Pradesh 452010, India
Mr Raman Chaddhaa (Director)
Response within 24 hrsNo spam, everFree consultation

Contact Details

Requirement

Additional Details

(optional — helps us respond faster)
Do you currently operate a boiler?