Module 06 · Start-up and Shutdown5 min read

Boiler Start-up: Pre-start Checks, Warm-up and Raising Pressure

Most boiler damage that is not caused by water is caused by starting too fast. A start-up is a sequence: check, fill, purge, light, warm, vent, raise pressure, warm the main, go on line. Each step protects something, and skipping one usually shows up later as a crack, a leak or a hammer.

ByShikhar Singh·Steam Consultant & IT Consultant·Published

You'll learn

  • Run through pre-start checks
  • Light up and warm a boiler from cold safely
  • Raise pressure and put the boiler on line
  • Understand why cold starts cost fuel and stress the boiler

Before this: Water level and pressure gauges, Burners and flame safety

BeginnerThe idea in plain words, and where you meet it. No maths.

Pre-start checks

  • Water: level in the gauge glasses at the normal start-up mark; both glasses agree; feed pump and feedwater supply ready; softener in service.
  • Valves: main steam stop valve closed; blowdown valves closed; vents and drains as the procedure requires (air vent open on a cold boiler).
  • Fuel: supply available and fuel system ready; for oil, at the right temperature; for solid fuel, bunker full and grate clear.
  • Air and draft: fans and dampers free; flue path clear and its dampers open.
  • Safety: safety valves free; pressure gauge reading zero; low-water alarm and cut-out tested; flame safety system healthy.
  • People: nobody inside the furnace, flues or drums; permits closed; access doors secured.
IntermediateThe formula, its units, and a worked example on real plant numbers.

Lighting up and raising pressure

  1. Purge the furnace and flues with air before any light-up.
  2. Light at the lowest firing rate, and keep it low. On solid fuel, build a small fire and spread it gradually.
  3. Leave the air vent open while the water heats; close it when steam blows freely from it, so that air is not trapped in the steam space.
  4. Raise pressure slowly, at the rate the manufacturer specifies, watching the water level as the water expands.
  5. Blow down the gauge glasses once pressure is up, and check the safety valves are free.
  6. Warm and drain the steam main from the boiler outward before opening the main steam stop valve.
  7. Open the main stop valve slowly to put the boiler on line, then let the burner modulate with load.

The water level rises on its own as the boiler warms: water expands as it heats. Start with the level at the start-up mark rather than at normal working level, and blow down a little if it climbs too high.

ExpertThe fine print: where the simple model breaks, and what it costs.

Why slowly, and what a cold start costs

Thick parts heat more slowly than thin ones. During a fast start the inside of a tube plate or drum is much hotter than the outside, and furnace parts heat faster than the shell around them. The resulting thermal stress, repeated at every fast start, cracks tube plates, loosens tube joints and fatigues welds. Refractory spalls for the same reason. A slow, steady rise in pressure keeps the temperature differences small.

Worked example
The energy just to warm a boiler up
Given
  • An illustrative shell boiler with 10 t of water and 15 t of steel, from 30 °C to working pressure, 10 kg/cm²(g) (183 °C).
  • Steel specific heat 0.49 kJ/(kg·K); coal at 4,000 kcal/kg burned at 75% efficiency (indicative figures).
  1. Water: 10,000 kg × 651.2 kJ/kg = 6.51 GJ.
  2. Steel: 15,000 × 0.49 × 153 = 1.13 GJ.
  3. Fuel: 7.64 GJ ÷ 4.1868 ÷ 4,000 ÷ 0.75 = about 608 kg of coal.
Answer: About 608 kg of coal before the boiler delivers a single kilogram of steam — every cold start. It is why plants that can keep a boiler warm overnight, or bank it, usually should.

Key takeaways

  • Check water, valves, fuel, air, safety devices and people before lighting up.
  • Purge, light at low fire, vent air, raise pressure slowly, warm the main, then open the stop valve slowly.
  • Slow starts keep thermal stress low in thick parts and refractory.
  • A cold start of an illustrative 10-tonne-water boiler costs about 608 kg of coal before any steam is used.

Check your understanding

Questions run from beginner to expert. Try each before opening the answer.

  1. Beginner

    Q1. What must happen before any burner light-up?

    1. A.Open the main stop valve
    2. B.Purge the furnace with air
    3. C.Blow down the boiler fully
    4. D.Close the air vent
    Show answer

    B. Purging clears any combustible gas from the furnace.

  2. Intermediate

    Q2. Why is the air vent left open while a cold boiler warms?

    1. A.To cool it
    2. B.To let air escape so it is not trapped in the steam space
    3. C.To lower the level
    4. D.To test the safety valve
    Show answer

    B. It is closed once steam blows freely from it.

  3. Intermediate

    Q3. Why does the water level rise during warm-up with no feed added?

    1. A.Leaks
    2. B.Water expands as it heats
    3. C.Scale
    4. D.Carryover
    Show answer

    B. Thermal expansion of the water raises the level.

  4. Expert

    Q4. What does a fast cold start mainly damage?

    1. A.The feed pump
    2. B.Thick parts and joints, through thermal stress
    3. C.The chimney
    4. D.The fuel
    Show answer

    B. Temperature differences across thick parts cause stress and fatigue.

Frequently asked

How do you start a boiler from cold?
Check water level, valves, fuel, air and safety devices; purge; light at low fire; vent air until steam blows; raise pressure slowly at the manufacturer’s rate; warm and drain the main; then open the stop valve slowly.
Why should a boiler be warmed up slowly?
To keep temperature differences across thick parts small. Fast starts cause thermal stress that cracks tube plates, loosens tube joints and spalls refractory.

Related equipment

Training a boiler team?

These lessons follow the order we train operators in. We also run on-site operator and maintenance training, built around your own plant.

Boiler operator training →

Sources

About the author

Shikhar SinghSteam Consultant & IT Consultant

Shikhar Singh is a Steam Consultant and IT Consultant at GyanTosh Fabricators Pvt. Ltd., where he works on steam system sizing, condensate recovery and the engineering content published on this site.

Full profile and background →